nPro
Navigation

5GDHC network in Schifferstadt (Max-Ernst-Straße)

On this page you find facts and figures about the 5GDHC network in Schifferstadt (Max-Ernst-Straße). The network has a length of 0.53 km. In total, 41 buildings are supplied by the heat network. The 5GDHC network is operated by Stadtwerke Schifferstadt .

Facts and figures about the cold heat network in Schifferstadt (Max-Ernst-Straße)

Geothermal probes, which are one of the most common heat sources for 5GDHC networks, serve as a heat source in this district. Uninsulated plastic pipes are used for the heating network. The network does not only supply the buildings with heat to operate the decentralized heat pumps, but also with cooling energy, e.g. for room air conditioning. If heating and cooling demands occur simultaneously, these can be balanced within the 5GDHC network (see also demand balancing in 5GDHC networks). The primary energy factor of the heat supply is 0.4. The district comprises new construction areas only. Buildings are obliged to connect to the heating network. Detailed data of the 5GDHC network in Schifferstadt (Max-Ernst-Straße) is listed in Table 1.

Table 1: Facts and figures about the anergy network in Schifferstadt (Max-Ernst-Straße)