5GDHC network in Herne (Shamrockpark)

On this page you find facts and figures about the 5GDHC network in Herne (Shamrockpark). The network has a length of 2 km. In total, 24 buildings are supplied by the heat network. The 5GDHC network is operated by Shamrock Energie GmbH .

Facts and figures about the cold heat network in Herne (Shamrockpark)

Insulated steel pipes are used for the heating network. The network does not only supply the buildings with heat to operate the decentralized heat pumps, but also with cooling energy, e.g. for room air conditioning. If heating and cooling demands occur simultaneously, these can be balanced within the 5GDHC network (see also demand balancing in 5GDHC networks). The primary energy factor of the heat supply is 0.4. The share of new construction area in this district is 50 %. Buildings are obliged to connect to the heating network. Detailed data of the 5GDHC network in Herne (Shamrockpark) is listed in Table 1.

Table 1: Facts and figures about the anergy network in Herne (Shamrockpark)
DistrictShamrockpark
CountryGermany
City / locationHerne
Year of commissioning2023
OperatorShamrock Energie GmbH
Network temperatures22/12 °C
Supplied buildings24
Network length2 km
Primary energy factor0.4
Share of new building area50 %
Heat generation capacity (energy hub)3000 kW
Pipe typeSteel pipe (insulated)
Heat sourcesCombined heat and power plant (CHP) Waste heat (industry) Waste heat (data center)
Cooling supply through thermal networkYes
Obligation to connect to networkYes
Owner of decentral heat pumpsHeat network operator
Billing boundary for delivered heatCondenser of the heat pump (building side)
Price model for heat supplyEnergy price (€/kWh) Capacity price (€/kW)
Price model for cold supplyEnergy price (€/kWh) Capacity price (€/kW)
Buildings receiving compensation for heat feed-inNo