5GDHC network in Dorsten-Wulfen (Barkenberg)
On this page you find facts and figures about the 5GDHC network in Dorsten-Wulfen (Barkenberg). The network has a length of 3 km. In total, 40 buildings are supplied by the heat network. The 5GDHC network is operated by OET Kälte & Wärme GmbH .
Facts and figures about the cold heat network in Dorsten-Wulfen (Barkenberg)
Uninsulated plastic pipes are used for the heating network. In this district, unlike in other districts, the 5GDHC network is only used to provide heat. A cooling supply is not considered. The primary energy factor of the heat supply is 0.25. The share of new construction area in this district is 0 %. Every building of the district is free to decide whether to connect to the heating network or not; there is no obligation to connect. Detailed data of the 5GDHC network in Dorsten-Wulfen (Barkenberg) is listed in Table 1.
District | Barkenberg |
Country | Germany |
City / location | Dorsten-Wulfen |
Year of commissioning | 1981 |
Operator | OET Kälte & Wärme GmbH |
Network temperatures | 12/6 °C |
Supplied buildings | 40 |
Network length | 3 km |
Primary energy factor | 0.25 |
Share of new building area | 0 % |
Heat generation capacity (energy hub) | 300 kW |
Pipe type | Plastic pipe (uninsulated) |
Heat sources |
Ground water / wells |
Cooling supply through thermal network | No |
Obligation to connect to network | No |
Owner of decentral heat pumps | Home/building owner |
Billing boundary for delivered heat | Evaporator of the heat pump (network side) |
Price model for heat supply |
Energy price (€/kWh) |
Buildings receiving compensation for heat feed-in | No |
This might also interest you
nPro software
Plan your energy system with nPro!