5GDHC network in Herne (Shamrockpark)
On this page you find facts and figures about the 5GDHC network in Herne (Shamrockpark). The network has a length of 2 km. In total, 24 buildings are supplied by the heat network. The 5GDHC network is operated by Shamrock Energie GmbH .
Facts and figures about the cold heat network in Herne (Shamrockpark)
Insulated steel pipes are used for the heating network. The network does not only supply the buildings with heat to operate the decentralized heat pumps, but also with cooling energy, e.g. for room air conditioning. If heating and cooling demands occur simultaneously, these can be balanced within the 5GDHC network (see also demand balancing in 5GDHC networks). The primary energy factor of the heat supply is 0.4. The share of new construction area in this district is 50 %. Buildings are obliged to connect to the heating network. Detailed data of the 5GDHC network in Herne (Shamrockpark) is listed in Table 1.
District | Shamrockpark |
Country | Germany |
City / location | Herne |
Year of commissioning | 2023 |
Operator | Shamrock Energie GmbH |
Network temperatures | 22/12 °C |
Supplied buildings | 24 |
Network length | 2 km |
Primary energy factor | 0.4 |
Share of new building area | 50 % |
Heat generation capacity (energy hub) | 3000 kW |
Pipe type | Steel pipe (insulated) |
Heat sources |
Combined heat and power plant (CHP) Waste heat (industry) Waste heat (data center) |
Cooling supply through thermal network | Yes |
Obligation to connect to network | Yes |
Owner of decentral heat pumps | Heat network operator |
Billing boundary for delivered heat | Condenser of the heat pump (building side) |
Price model for heat supply |
Energy price (€/kWh) Capacity price (€/kW) |
Price model for cold supply |
Energy price (€/kWh) Capacity price (€/kW) |
Buildings receiving compensation for heat feed-in | No |